{"id":15084,"date":"2019-08-26T14:46:07","date_gmt":"2019-08-26T19:46:07","guid":{"rendered":"https:\/\/rnrachicago.org\/?p=15084"},"modified":"2019-08-26T14:46:07","modified_gmt":"2019-08-26T19:46:07","slug":"the-chicago-avenue-resurfacing-project-betwen-larrabee-street-michigan-avenue","status":"publish","type":"post","link":"https:\/\/newsite.rnrachicago.org\/?p=15084","title":{"rendered":"The Chicago Avenue Resurfacing Project &#8211; Between Larrabee Street &#038; Michigan Avenue"},"content":{"rendered":"<p>The Chicago Avenue Resurfacing Project Begins<\/p>\n<p>Please be aware that this month sees the beginning of a large repaving and infrastructure improvement project on Chicago Avenue, located between Larrabee Street and Michigan Avenue.<\/p>\n<p>This project is part of the Chicago Department of Transportation&#8217;s Arterial Street Resurfacing Central Area Project. These improvements include ADA sidewalk upgrades, curb and gutter removal and replacement, milling and\u00a0paving of the existing asphalt pavement, and final restoration and striping of the lane.<\/p>\n<p>During construction, temporary &#8220;No Parking&#8221; signs will be periodically installed as required for each phase of the project. Parking may be restricted during working hours. This project is scheduled to be completed by\u00a0December, 2019.<\/p>\n<p>If you have any questions about this project, please contact the 2nd Ward office at (312) 643-2299, or by email at\u00a0ward02@cityofchicago.org<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-15085 size-full\" src=\"https:\/\/rnrachicago.org\/wp-content\/uploads\/2019\/09\/2f9ce262-7657-4dchicago-avenue-resurvace0.png\" alt=\"\" width=\"1057\" height=\"717\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Chicago Avenue Resurfacing Project Begins Please be aware that this month sees the beginning of a large repaving and infrastructure improvement project on Chicago Avenue, located between Larrabee Street and Michigan Avenue. This project is part of the Chicago Department of Transportation&#8217;s Arterial Street Resurfacing Central Area Project. These improvements include ADA sidewalk upgrades, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":15085,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-15084","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-community"],"_links":{"self":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/posts\/15084","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15084"}],"version-history":[{"count":0,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/posts\/15084\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15084"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15084"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15084"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}