{"id":15594,"date":"2019-11-07T11:03:04","date_gmt":"2019-11-07T17:03:04","guid":{"rendered":"https:\/\/rnrachicago.org\/?p=15594"},"modified":"2019-11-07T11:03:04","modified_gmt":"2019-11-07T17:03:04","slug":"one-square-chicago","status":"publish","type":"post","link":"https:\/\/newsite.rnrachicago.org\/?p=15594","title":{"rendered":"Message from Alderman Hopkins &#8211; Construction Update for Saturday 11-9 &#8211; One Square Chicago Project"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-9895\" src=\"https:\/\/rnrachicago.org\/wp-content\/uploads\/2018\/06\/11bed408-f877-4390-8481-1277aa80e5b5-300x75.png\" alt=\"\" width=\"300\" height=\"75\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-14847\" src=\"https:\/\/rnrachicago.org\/wp-content\/uploads\/2019\/08\/Construction-Updates-300x116.jpg\" alt=\"\" width=\"300\" height=\"116\" \/><\/p>\n<p>Dear Neighbor,<\/p>\n<p>As the One Square Chicago Project continues, please be aware that this\u00a0Saturday, November 9, 2019, Power Construction will engage in a large, continuous concrete foundation pour at the\u00a0site. Workers will begin staging four concrete pumps and other equipment at 4:30 AM, with the first concrete placement expected to begin at 5:45 AM.<\/p>\n<p>The operation consists of 40 concrete trucks lining up throughout the course of the day to pour 3,500 cubic yards of concrete. The concrete pour is expected to take 10 to 12 hours to\u00a0complete, with an additional hour for cleanup. Sweepers and vacuum trucks will be actively deployed to mitigate dust and dirt on the streets.<\/p>\n<p>Flaggers will be posted on each of the four corners of the site for the duration of the event for pedestrian safety and traffic congestion mitigation. Concrete trucks will approach the site from\u00a0Superior Avenue, north onto Dearborn, and will traverse the site clockwise to one of the four staging areas designated for each of the four pumps onsite.<\/p>\n<p>Power Construction has secured the approval and proper permits for these plans from the Chicago Department of Transportation, which will also include street and sidewalk closures for the\u00a0day.<\/p>\n<p>Should you have any questions, please send an email to the 2nd Ward Service Office (Ward02@cityofchicago.org) or call (312) 643-2299.<\/p>\n<p>Sincerely,<\/p>\n<p>Alderman Brian Hopkins<br \/>\n2nd Ward<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dear Neighbor, As the One Square Chicago Project continues, please be aware that this\u00a0Saturday, November 9, 2019, Power Construction will engage in a large, continuous concrete foundation pour at the\u00a0site. Workers will begin staging four concrete pumps and other equipment at 4:30 AM, with the first concrete placement expected to begin at 5:45 AM. The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14847,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-15594","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-community"],"_links":{"self":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/posts\/15594","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15594"}],"version-history":[{"count":0,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/posts\/15594\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15594"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15594"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}