{"id":21326,"date":"2021-08-20T16:17:01","date_gmt":"2021-08-20T21:17:01","guid":{"rendered":"https:\/\/rnrachicago.org\/?p=21326"},"modified":"2021-08-20T16:17:01","modified_gmt":"2021-08-20T21:17:01","slug":"neighborhood-notice-state-street-tower-crane-removal","status":"publish","type":"post","link":"https:\/\/newsite.rnrachicago.org\/?p=21326","title":{"rendered":"Neighborhood Notice: State Street Tower Crane Removal"},"content":{"rendered":"<figure id=\"attachment_21327\" aria-describedby=\"caption-attachment-21327\" style=\"width: 477px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-21327 size-full\" src=\"https:\/\/rnrachicago.org\/wp-content\/uploads\/2021\/08\/State-Street-Closure.jpg\" alt=\"\" width=\"477\" height=\"233\" \/><figcaption id=\"caption-attachment-21327\" class=\"wp-caption-text\">SummerDance EBLAST Aug 2021<\/figcaption><\/figure>\n<p>Beginning on Monday, August 30, Power Construction will begin the removal process of\u00a0the tower crane that was used throughout the construction project at\u00a0<strong><a href=\"https:\/\/jdlcorp.com\/projects\/one-chicago\">One Chicago<\/a><\/strong>.<\/p>\n<p>During that time, State Street will be closed between Superior Street and Chicago\u00a0Avenue. Adverse weather conditions could extend this time frame.<\/p>\n<p>Power Construction has committed to no truck staging on Superior Street during this time\u00a0and will have personnel there for enforcement.<\/p>\n<p>Please feel free to reach to the 2nd Ward office for any additional updates by emailing\u00a0<a href=\"mailto:Ward02@cityofchicago.org\">Ward02@cityofchicago.org<\/a>\u00a0or by calling (312) 643-2299.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Beginning on Monday, August 30, Power Construction will begin the removal process of\u00a0the tower crane that was used throughout the construction project at\u00a0One Chicago. During that time, State Street will be closed between Superior Street and Chicago\u00a0Avenue. Adverse weather conditions could extend this time frame. Power Construction has committed to no truck staging on Superior [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":21327,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-21326","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-community"],"_links":{"self":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/posts\/21326","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21326"}],"version-history":[{"count":0,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/posts\/21326\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21326"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=21326"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=21326"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}