{"id":7518,"date":"2017-10-16T19:29:14","date_gmt":"2017-10-16T19:29:14","guid":{"rendered":"https:\/\/rnrachicago.org\/?p=7518"},"modified":"2017-10-16T19:29:14","modified_gmt":"2017-10-16T19:29:14","slug":"neighborhood-notice-dearborn-street-infrastructure-improvements","status":"publish","type":"post","link":"https:\/\/newsite.rnrachicago.org\/?p=7518","title":{"rendered":"Neighborhood Notice: Dearborn Street Infrastructure Improvements"},"content":{"rendered":"<p>Source: \u00a0Alderman Brian Hopkins &#8211; \u00a02nd Ward<\/p>\n<p>Please be aware\u00a0of an upcoming resurfacing project on Dearborn Street between Chicago Avenue and the Chicago River Bridge.<\/p>\n<p>Construction is tentatively scheduled to begin this week (week of 10-16-17) \u00a0and\u00a0will include ADA sidewalk improvements, curb and gutter removal and replacement, milling, paving, and striping.\u00a0This work is part of the Chicago Department of Transportation\u2019s Arterial Street Resurfacing Central Area Project.<\/p>\n<p>During construction, temporary \u201cNo Parking\u201d signs will be periodically installed as required. These temporary signs will restrict parking during working hours, while adhering to rush hour restrictions, for the completion of the work. \u00a0All work on this corridor is scheduled to be completed by December 31st.<\/p>\n<p>If you have any additional question please email \u00a0<a href=\"mailto:Ward02@cityofchicago.org\">Ward02@cityofchicago.org<\/a>, or call the 2nd Ward Service Office at (312) 643-2299.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-7519 size-full\" src=\"https:\/\/rnrachicago.org\/wp-content\/uploads\/2017\/10\/Infrastructure-Project.png\" alt=\"\" width=\"506\" height=\"598\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Source: \u00a0Alderman Brian Hopkins &#8211; \u00a02nd Ward Please be aware\u00a0of an upcoming resurfacing project on Dearborn Street between Chicago Avenue and the Chicago River Bridge. Construction is tentatively scheduled to begin this week (week of 10-16-17) \u00a0and\u00a0will include ADA sidewalk improvements, curb and gutter removal and replacement, milling, paving, and striping.\u00a0This work is part of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-7518","post","type-post","status-publish","format-standard","hentry","category-community"],"_links":{"self":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/posts\/7518","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7518"}],"version-history":[{"count":0,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=\/wp\/v2\/posts\/7518\/revisions"}],"wp:attachment":[{"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7518"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7518"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsite.rnrachicago.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}